Serial number
Project name
Build a place
Build an unit
Fundamental condition
1
The country controls small ” project greatly on 2×600MW“ of power plant of electric suddenly administrative division
Shanxi visits the town that face Fen
Country power plant of electric suddenly administrative division
Discharge capacity of 2 oxidation sulfur is entire plant 6430 tons / year, originate existing project closes stop reduce an amount 17385 tons / year; Liquid waste 0 discharge.
2
Big Tang Guiguan adds up to hill to generate electricity small ” project is controlled greatly on “ of unit of class of limited company 2×600MW
City of guest of Guangxi Zhuang Autonomous Region
Big Tang Guiguan adds up to hill to generate electricity limited company
This period 2 oxidation sulfur discharges gross 7582.91 tons / year, origin: Big Tang Geshan generates electricity limited company has aircrew to involve remaining sum of the gross after stopping, reduce discharge capacity of 2 oxidation sulfur 47287.89 tons / year; Liquid waste 0 discharge.
3
Power plant of Shanxi right jade (aircrew of gangue of empty Leng Ran of fluid-bed of 2×300 million made of baked clay loop) project
Shanxi visits town of new moon city
Power plant of Shanxi right jade
2 oxidation sulfur arranges the project 3538 tons / year, gross index used blowdown authority to trade method, close light of city of state staying the first day of the lunar month to amount to share collaboration power plant 2 oxidation sulfur 980 tons / year, to decoke of flue gas of the 2nd power plant cuts Shanxi god head 2 oxidation sulfur 3672 tons / year, both and aggregate displacement gives this project 2 oxidation sulfur 4652 tons / year; Liquid waste 0 discharge.
4
Project of heat and power plant of hill of grand of Fujian stone lion (2×600MW exceeds critical smoke coagulate heat addition aircrew)
Previous12 Next
Next:On May 12, 2008 - total bureau of national environmental protection will accept